| Mfr. #: | DRV612EVM |
|---|---|
| メーカー: | Texas Instruments |
| 説明: | EVAL MODULE FOR DRV612 |
| ライフサイクル: | メーカー新製品 |
| データシート: | DRV612EVM データシート |


Product belongs to the DirectPath series. Bulk is the packaging method for this product Output-Type: 2-Channel (Stereo) Voltage Supply Range: 3 V ~ 3.6 V Maximum Output Power of - for 1 channel The amplifier is of Class AB type. Included item: Board. IC package type: DRV612 Board type: Fully Populated. This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the DRV612.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV612EVM Specifications
A: At what frequency does the Series?
Q: The product Series is DirectPath.
A: Is the cutoff frequency of the product Packaging?
Q: Yes, the product's Packaging is indeed Bulk
A: At what frequency does the Output-Type?
Q: The product Output-Type is 2-Channel (Stereo).
A: At what frequency does the Voltage-Supply?
Q: The product Voltage-Supply is 3 V ~ 3.6 V.
A: What is the Max-Output-Power-x-Channels-Load of the product?
Q: The Max-Output-Power-x-Channels-Load of the product is -.
A: What is the Amplifier-Type of the product?
Q: The Amplifier-Type of the product is Class AB.
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board.
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is DRV612.
A: What is the Board-Type of the product?
Q: The Board-Type of the product is Fully Populated.
A: Is the cutoff frequency of the product Operating-Supply-Voltage?
Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is DRV612.