| Mfr. #: | DRV632EVM |
|---|---|
| メーカー: | Texas Instruments |
| 説明: | EVAL MODULE FOR DRV632 |
| ライフサイクル: | メーカー新製品 |
| データシート: | DRV632EVM データシート |


Product belongs to the DirectPath series. This product is categorized as Evaluation Modules Type: Audio Amplifiers Bulk is the packaging method for this product Output-Type: 2-Channel (Stereo) Voltage Supply Range: 3 V ~ 3.6 V Maximum Output Power of - for 1 channel The amplifier is of Class AB type. Included item: Board. IC package type: DRV632 Board type: Fully Populated. This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the DRV632. 25 mA is 92 nA.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV632EVM Specifications
A: At what frequency does the Series?
Q: The product Series is DirectPath.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is Audio Amplifiers.
A: At what frequency does the Packaging?
Q: The product Packaging is Bulk.
A: At what frequency does the Output-Type?
Q: The product Output-Type is 2-Channel (Stereo).
A: What is the Voltage-Supply of the product?
Q: The Voltage-Supply of the product is 3 V ~ 3.6 V.
A: At what frequency does the Max-Output-Power-x-Channels-Load?
Q: The product Max-Output-Power-x-Channels-Load is -.
A: At what frequency does the Amplifier-Type?
Q: The product Amplifier-Type is Class AB.
A: Is the cutoff frequency of the product Supplied-Contents?
Q: Yes, the product's Supplied-Contents is indeed Board
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed DRV632
A: What is the Board-Type of the product?
Q: The Board-Type of the product is Fully Populated.
A: Is the cutoff frequency of the product Operating-Supply-Voltage?
Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV632
A: What is the Operating-Supply-Current of the product?
Q: The Operating-Supply-Current of the product is 25 mA.