DRV8802EVM

Mfr. #: DRV8802EVM
メーカー: Texas Instruments
説明: EVAL MODULE FOR DRV8802
ライフサイクル: メーカー新製品
データシート: DRV8802EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8802EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Motor / Motion Controllers & Drivers Bulk is the packaging method for this product The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: Dual Full-Bridge (H-Bridge), 1.1A (1.6A Peak), 8.2V ~ 45V IC package type: DRV8802 This tool is designed for the DRV8802. USB interface type

DRV8802EVM Image

DRV8802EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8802EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Motor / Motion Controllers & Drivers
  • Packaging Bulk
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes Dual Full-Bridge (H-Bridge), 1.1A (1.6A Peak), 8.2V ~ 45V
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part DRV8802
  • Tool-Is-For-Evaluation-Of DRV8802
  • Interface-Type USB

DRV8802EVM

DRV8802EVM Specifications

DRV8802EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Motor / Motion Controllers & Drivers.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Power Management, Motor Control.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed Dual Full-Bridge (H-Bridge), 1.1A (1.6A Peak), 8.2V ~ 45V

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed DRV8802

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DRV8802.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$172.52
$172.52
10
$163.89
$1 638.89
100
$155.26
$15 526.35
500
$146.64
$73 318.90
1000
$138.01
$138 012.00
Top