| Mfr. #: | DRV8804EVM |
|---|---|
| メーカー: | Texas Instruments |
| 説明: | EVAL MODULE FOR DRV8804 |
| ライフサイクル: | メーカー新製品 |
| データシート: | DRV8804EVM データシート |


Product belongs to the - series. This product is categorized as Evaluation Modules The Power Management, Motor Control, Stepper is the Main-Purpose. Primary-Attributes: 4 Channel Low-Side Driver IC package type: DRV8804 Maximum operating temperature of + 85 C This tool is designed for the DRV8804. USB interface type

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8804EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: Is the cutoff frequency of the product Main-Purpose?
Q: Yes, the product's Main-Purpose is indeed Power Management, Motor Control, Stepper
A: At what frequency does the Primary-Attributes?
Q: The product Primary-Attributes is 4 Channel Low-Side Driver.
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed DRV8804
A: Is the cutoff frequency of the product Maximum-Operating-Temperature?
Q: Yes, the product's Maximum-Operating-Temperature is indeed + 85 C
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is DRV8804.
A: Is the cutoff frequency of the product Interface-Type?
Q: Yes, the product's Interface-Type is indeed USB