| Mfr. #: | DRV8806EVM |
|---|---|
| メーカー: | Texas Instruments |
| 説明: | EVAL MODULE FOR DRV8806 |
| ライフサイクル: | メーカー新製品 |
| データシート: | DRV8806EVM データシート |


Product belongs to the - series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: 4 Channel Low-Side Driver IC package type: DRV8806 Output voltage: 40 V This tool is designed for the DRV8806. Input Voltage Range: 8.2 V to 40 V Output current: 2 A

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8806EVM Specifications
A: Is the cutoff frequency of the product Series?
Q: Yes, the product's Series is indeed -
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is Motor / Motion Controllers & Drivers.
A: At what frequency does the Main-Purpose?
Q: The product Main-Purpose is Power Management, Motor Control.
A: Is the cutoff frequency of the product Primary-Attributes?
Q: Yes, the product's Primary-Attributes is indeed 4 Channel Low-Side Driver
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is DRV8806.
A: What is the Output-Voltage of the product?
Q: The Output-Voltage of the product is 40 V.
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is DRV8806.
A: What is the Input-Voltage of the product?
Q: The Input-Voltage of the product is 8.2 V to 40 V.
A: What is the Output-Current of the product?
Q: The Output-Current of the product is 2 A.