| Mfr. #: | DRV8833EVM |
|---|---|
| メーカー: | Texas Instruments |
| 説明: | EVAL MODULE FOR DRV8833 |
| ライフサイクル: | メーカー新製品 |
| データシート: | DRV8833EVM データシート |


Product belongs to the - series. This product is categorized as Evaluation Modules Type: Power Management Specialized Bulk is the packaging method for this product The Power Management, Motor Control, Stepper is the Main-Purpose. Primary-Attributes: Stepper or Single/Dual Brushed DC Motor, 2A Peek IC package type: DRV8833 This tool is designed for the DRV8833. Output current: 1.5 A

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8833EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: At what frequency does the Type?
Q: The product Type is Power Management Specialized.
A: Is the cutoff frequency of the product Packaging?
Q: Yes, the product's Packaging is indeed Bulk
A: At what frequency does the Main-Purpose?
Q: The product Main-Purpose is Power Management, Motor Control, Stepper.
A: What is the Primary-Attributes of the product?
Q: The Primary-Attributes of the product is Stepper or Single/Dual Brushed DC Motor, 2A Peek.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is DRV8833.
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV8833
A: What is the Output-Current of the product?
Q: The Output-Current of the product is 1.5 A.