DRV8843EVM

Mfr. #: DRV8843EVM
メーカー: Texas Instruments
説明: EVAL MODULE FOR DRV8843
ライフサイクル: メーカー新製品
データシート: DRV8843EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8843EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Motor / Motion Controllers & Drivers Bulk is the packaging method for this product The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: Dual Full-Bridge (H-Bridge) Driver with PWM Current Controller IC package type: DRV8843 This tool is designed for the DRV8843. USB interface type Output current: 2.5 A

DRV8843EVM Image

DRV8843EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8843EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Motor / Motion Controllers & Drivers
  • Packaging Bulk
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes Dual Full-Bridge (H-Bridge) Driver with PWM Current Controller
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part DRV8843
  • Tool-Is-For-Evaluation-Of DRV8843
  • Interface-Type USB
  • Output-Current 2.5 A

DRV8843EVM

DRV8843EVM Specifications

DRV8843EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Motor / Motion Controllers & Drivers

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Power Management, Motor Control.

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is Dual Full-Bridge (H-Bridge) Driver with PWM Current Controller.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is DRV8843.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DRV8843.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed USB

  • A: At what frequency does the Output-Current?

    Q: The product Output-Current is 2.5 A.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$172.52
$172.52
10
$163.89
$1 638.89
100
$155.26
$15 526.35
500
$146.64
$73 318.90
1000
$138.01
$138 012.00
Top