DRV8880EVM

Mfr. #: DRV8880EVM
メーカー: Texas Instruments
説明: EVALUATION MODULE DRV8880
ライフサイクル: メーカー新製品
データシート: DRV8880EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8880EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers Bulk is the packaging method for this product The Power Management, Motor Control, Stepper is the Main-Purpose. Primary-Attributes: Dual Full-Bridge (H-Bridge) Driver IC package type: DRV8880 This product is an DRV8880 dual half-bridge motor driver evaluation module. This tool is designed for the DRV8880. Input Voltage Range: 6.5 V to 45 V Output current: 2A

DRV8880EVM Image

DRV8880EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8880EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • Packaging Bulk
  • Main-Purpose Power Management, Motor Control, Stepper
  • Primary-Attributes Dual Full-Bridge (H-Bridge) Driver
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part DRV8880
  • Description-Function DRV8880 dual half-bridge motor driver evaluation module
  • Tool-Is-For-Evaluation-Of DRV8880
  • Input-Voltage 6.5 V to 45 V
  • Output-Current 2A

DRV8880EVM

DRV8880EVM Specifications

DRV8880EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Motor / Motion Controllers & Drivers

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Motor Control, Stepper

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed Dual Full-Bridge (H-Bridge) Driver

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is DRV8880.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is DRV8880 dual half-bridge motor driver evaluation module.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DRV8880.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 6.5 V to 45 V.

  • A: What is the Output-Current of the product?

    Q: The Output-Current of the product is 2A.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$73.50
$73.50
10
$69.82
$698.25
100
$66.15
$6 615.00
500
$62.48
$31 237.50
1000
$58.80
$58 800.00
Top