FDC2214EVM

Mfr. #: FDC2214EVM
メーカー: Texas Instruments
説明: EVAL BOARD FOR FDC2214
ライフサイクル: メーカー新製品
データシート: FDC2214EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
FDC2214EVM Overview

Product belongs to the - series. This product is categorized as Demonstration Boards Type: Capacitive Touch Sensors Bulk is the packaging method for this product Sensitivity: - Interface: I2C Voltage Supply Range: 2.7 V ~ 3.6 V Touch, Capacitive Sensing range of 2 Buttons/Keys Included item: Board. IC package type: FDC2214 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the FDC2214.

FDC2214EVM Image

FDC2214EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

FDC2214EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Product Demonstration Boards
  • Type Capacitive Touch Sensors
  • Packaging Bulk
  • Sensitivity -
  • Interface I2C
  • Voltage-Supply 2.7 V ~ 3.6 V
  • Sensor-Type Touch, Capacitive
  • Sensing-Range 2 Buttons/Keys
  • Supplied-Contents Board
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part FDC2214
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of FDC2214

FDC2214EVM

FDC2214EVM Specifications

FDC2214EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Demonstration Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Capacitive Touch Sensors.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Sensitivity?

    Q: The product Sensitivity is -.

  • A: What is the Interface of the product?

    Q: The Interface of the product is I2C.

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is 2.7 V ~ 3.6 V.

  • A: At what frequency does the Sensor-Type?

    Q: The product Sensor-Type is Touch, Capacitive.

  • A: Is the cutoff frequency of the product Sensing-Range?

    Q: Yes, the product's Sensing-Range is indeed 2 Buttons/Keys

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is FDC2214.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed FDC2214

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$45.04
$45.04
10
$42.79
$427.93
100
$40.54
$4 054.05
500
$38.29
$19 144.15
1000
$36.04
$36 036.00
Top