| Mfr. #: | HDC1000EVM |
|---|---|
| メーカー: | Texas Instruments |
| 説明: | Sensor Development Tools Temperature Sensor Development Tools HDC1000 Eval Mod |
| ライフサイクル: | メーカー新製品 |
| データシート: | HDC1000EVM データシート |


Product belongs to the HDC1000 series. This product is categorized as Evaluation Kits Type: Humidity Temperature Sensors Sensitivity: ±0.2°C, ±3% Interface: I2C Voltage Supply Range: - Humidity, Temperature Sensing range of -20°C ~ 85°C, 0 ~ 100% RH Included item: Board. IC package type: HDC1000 Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the HDC1000. I2C USB interface type

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

HDC1000EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is HDC1000.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Kits.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Humidity Temperature Sensors
A: At what frequency does the Sensitivity?
Q: The product Sensitivity is ±0.2°C, ±3%.
A: Is the cutoff frequency of the product Interface?
Q: Yes, the product's Interface is indeed I2C
A: Is the cutoff frequency of the product Voltage-Supply?
Q: Yes, the product's Voltage-Supply is indeed -
A: At what frequency does the Sensor-Type?
Q: The product Sensor-Type is Humidity, Temperature.
A: Is the cutoff frequency of the product Sensing-Range?
Q: Yes, the product's Sensing-Range is indeed -20°C ~ 85°C, 0 ~ 100% RH
A: What is the Supplied-Contents of the product?
Q: The Supplied-Contents of the product is Board.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is HDC1000.
A: What is the Maximum-Operating-Temperature of the product?
Q: The Maximum-Operating-Temperature of the product is + 125 C.
A: At what frequency does the Minimum-Operating-Temperature?
Q: The product Minimum-Operating-Temperature is - 40 C.
A: What is the Operating-Supply-Voltage of the product?
Q: The Operating-Supply-Voltage of the product is 3.3 V.
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is HDC1000.
A: What is the Interface-Type of the product?
Q: The Interface-Type of the product is I2C USB.