LDC1000EVM

Mfr. #: LDC1000EVM
メーカー: Texas Instruments
説明: EVAL BOARD FOR LDC1000
ライフサイクル: メーカー新製品
データシート: LDC1000EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LDC1000EVM Overview

Product belongs to the LDC1000 series. This product is categorized as Evaluation Modules Type: Inductance to Digital Bulk is the packaging method for this product This product is designed LDC1000 amplifier. Sensitivity: - Interface: USB Voltage Supply Range: 5V, USB Proximity, Inductive Sensing range of - Included item: Board. IC package type: LDC1000 Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C This product operates at a 5 V supply voltage for reliable performance. This product is an Designed to provide an example LC tank and coil structure application to interface to a host computer. This tool is designed for the LDC1000. 1.7 mA is 92 nA. USB interface type

LDC1000EVM Image

LDC1000EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LDC1000EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series LDC1000
  • Product Evaluation Modules
  • Type Inductance to Digital
  • Packaging Bulk
  • For-Use-With LDC1000
  • Sensitivity -
  • Interface USB
  • Voltage-Supply 5V, USB
  • Sensor-Type Proximity, Inductive
  • Sensing-Range -
  • Supplied-Contents Board
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part LDC1000
  • Maximum-Operating-Temperature + 125 C
  • Minimum-Operating-Temperature - 40 C
  • Operating-Supply-Voltage 5 V
  • Description-Function Designed to provide an example LC tank and coil structure application to interface to a host computer
  • Tool-Is-For-Evaluation-Of LDC1000
  • Operating-Supply-Current 1.7 mA
  • Interface-Type USB

LDC1000EVM

LDC1000EVM Specifications

LDC1000EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is LDC1000.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Inductance to Digital.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is LDC1000.

  • A: What is the Sensitivity of the product?

    Q: The Sensitivity of the product is -.

  • A: Is the cutoff frequency of the product Interface?

    Q: Yes, the product's Interface is indeed USB

  • A: Is the cutoff frequency of the product Voltage-Supply?

    Q: Yes, the product's Voltage-Supply is indeed 5V, USB

  • A: Is the cutoff frequency of the product Sensor-Type?

    Q: Yes, the product's Sensor-Type is indeed Proximity, Inductive

  • A: At what frequency does the Sensing-Range?

    Q: The product Sensing-Range is -.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is LDC1000.

  • A: At what frequency does the Maximum-Operating-Temperature?

    Q: The product Maximum-Operating-Temperature is + 125 C.

  • A: Is the cutoff frequency of the product Minimum-Operating-Temperature?

    Q: Yes, the product's Minimum-Operating-Temperature is indeed - 40 C

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 5 V.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is Designed to provide an example LC tank and coil structure application to interface to a host computer.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed LDC1000

  • A: What is the Operating-Supply-Current of the product?

    Q: The Operating-Supply-Current of the product is 1.7 mA.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$41.85
$41.85
10
$39.76
$397.58
100
$37.66
$3 766.50
500
$35.57
$17 786.25
1000
$33.48
$33 480.00
Top