LM3630EVM

Mfr. #: LM3630EVM
メーカー: Texas Instruments
説明: LED Lighting Development Tools LM3630 EVAL MOD
ライフサイクル: メーカー新製品
データシート: LM3630EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LM3630EVM Overview

Product belongs to the LM3630 series. This product is categorized as Evaluation Modules This product is designed LM3630 amplifier. 2.3 V ~ 5.5 V voltage input Current-Output-Channel is - Output voltage: - Included item: Board, Cable. IC package type: LM3630 The product has - outputs. Processor Core: LM3630

LM3630EVM Image

LM3630EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LM3630EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - LED Drivers
  • Series LM3630
  • Product Evaluation Modules
  • For-Use-With LM3630
  • Features Dimmable, USB Interface
  • Voltage-Input 2.3 V ~ 5.5 V
  • Current-Output-Channel -
  • Voltage-Output -
  • Supplied-Contents Board, Cable
  • Utilized-IC-Part LM3630
  • Outputs-and-Type -
  • Core LM3630

LM3630EVM

LM3630EVM Specifications

LM3630EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is LM3630.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is LM3630.

  • A: What is the Voltage-Input of the product?

    Q: The Voltage-Input of the product is 2.3 V ~ 5.5 V.

  • A: What is the Current-Output-Channel of the product?

    Q: The Current-Output-Channel of the product is -.

  • A: At what frequency does the Voltage-Output?

    Q: The product Voltage-Output is -.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board, Cable.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is LM3630.

  • A: Is the cutoff frequency of the product Outputs-and-Type?

    Q: Yes, the product's Outputs-and-Type is indeed -

  • A: What is the Core of the product?

    Q: The Core of the product is LM3630.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$0.00
$0.00
10
$0.00
$0.00
100
$0.00
$0.00
500
$0.00
$0.00
1000
$0.00
$0.00
Top