OPT3001EVM

Mfr. #: OPT3001EVM
メーカー: Texas Instruments
説明: Sensor Development Tools Optical Sensor Development Tools Ambient Light Sensor Eval Board
ライフサイクル: メーカー新製品
データシート: OPT3001EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
OPT3001EVM Overview

Product belongs to the OPT3001 series. This product is categorized as Evaluation Modules Type: Ambient Light Sensors Bulk is the packaging method for this product Sensitivity: 550nm Interface: I2C Voltage Supply Range: 1.6 V ~ 3.6 V Light, Ambient Sensing range of - Included item: 2 Boards, Cable. IC package type: OPT3001 Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C This product operates at a 1.6 V to 3.6 V supply voltage for reliable performance. This product is an -. This tool is designed for the OPT3001. I2C USB interface type Our product measures - in dimensions for compact and convenient use.

OPT3001EVM Image

OPT3001EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

OPT3001EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series OPT3001
  • Product Evaluation Modules
  • Type Ambient Light Sensors
  • Packaging Bulk
  • Sensitivity 550nm
  • Interface I2C
  • Voltage-Supply 1.6 V ~ 3.6 V
  • Sensor-Type Light, Ambient
  • Sensing-Range -
  • Supplied-Contents 2 Boards, Cable
  • Embedded -
  • Utilized-IC-Part OPT3001
  • Maximum-Operating-Temperature + 85 C
  • Minimum-Operating-Temperature - 40 C
  • Operating-Supply-Voltage 1.6 V to 3.6 V
  • Description-Function -
  • Tool-Is-For-Evaluation-Of OPT3001
  • Interface-Type I2C USB
  • Dimensions -

OPT3001EVM

OPT3001EVM Specifications

OPT3001EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is OPT3001.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Ambient Light Sensors

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the Sensitivity of the product?

    Q: The Sensitivity of the product is 550nm.

  • A: What is the Interface of the product?

    Q: The Interface of the product is I2C.

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is 1.6 V ~ 3.6 V.

  • A: What is the Sensor-Type of the product?

    Q: The Sensor-Type of the product is Light, Ambient.

  • A: What is the Sensing-Range of the product?

    Q: The Sensing-Range of the product is -.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is 2 Boards, Cable.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is OPT3001.

  • A: What is the Maximum-Operating-Temperature of the product?

    Q: The Maximum-Operating-Temperature of the product is + 85 C.

  • A: At what frequency does the Minimum-Operating-Temperature?

    Q: The product Minimum-Operating-Temperature is - 40 C.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 1.6 V to 3.6 V

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed -

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is OPT3001.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is I2C USB.

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is -.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$28.95
$28.95
10
$27.50
$275.03
100
$26.06
$2 605.50
500
$24.61
$12 303.75
1000
$23.16
$23 160.00
Top