PCM1860EVM

Mfr. #: PCM1860EVM
メーカー: Texas Instruments
説明: EVAL BOARD FOR PCM1860
ライフサイクル: メーカー新製品
データシート: PCM1860EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
PCM1860EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Audio ADC This product is designed USB-I2X amplifier. The Audio, Audio Processing is the Main-Purpose. Primary-Attributes: Audio Front End IC package type: PCM1860 This product operates at a 5 V supply voltage for reliable performance. This product is an Evaluation board for the PCM186x family of ADCs. This tool is designed for the PCM1860. USB interface type

PCM1860EVM Image

PCM1860EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

PCM1860EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Audio ADC
  • For-Use-With USB-I2X
  • Main-Purpose Audio, Audio Processing
  • Primary-Attributes Audio Front End
  • Embedded No
  • Utilized-IC-Part PCM1860
  • Operating-Supply-Voltage 5 V
  • Description-Function Evaluation board for the PCM186x family of ADCs
  • Tool-Is-For-Evaluation-Of PCM1860
  • Interface-Type USB

PCM1860EVM

PCM1860EVM Specifications

PCM1860EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Audio ADC

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is USB-I2X.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Audio, Audio Processing.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is Audio Front End.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed PCM1860

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 5 V

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is Evaluation board for the PCM186x family of ADCs.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is PCM1860.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed USB

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$223.50
$223.50
10
$212.32
$2 123.25
100
$201.15
$20 115.00
500
$189.98
$94 987.50
1000
$178.80
$178 800.00
Top