PCM9211EVM-U

Mfr. #: PCM9211EVM-U
メーカー: Texas Instruments
説明: EVAL MODULE FOR PCM9211
ライフサイクル: メーカー新製品
データシート: PCM9211EVM-U データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
PCM9211EVM-U Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Audio Transceivers Bulk is the packaging method for this product The Audio, Audio Processing is the Main-Purpose. Primary-Attributes: - IC package type: PCM9211 This product operates at a 3.3 V 5 V supply voltage for reliable performance. This product is an 216 KHz Digital Audio Interface Transceiver. This tool is designed for the PCM9211. 13 mA is 92 nA. I2C USB interface type

PCM9211EVM-U Image

PCM9211EVM-U

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

PCM9211EVM-U Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Audio Transceivers
  • Packaging Bulk
  • Main-Purpose Audio, Audio Processing
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part PCM9211
  • Operating-Supply-Voltage 3.3 V 5 V
  • Description-Function 216 KHz Digital Audio Interface Transceiver
  • Tool-Is-For-Evaluation-Of PCM9211
  • Operating-Supply-Current 13 mA
  • Interface-Type I2C USB

PCM9211EVM-U

PCM9211EVM-U Specifications

PCM9211EVM-U FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Audio Transceivers.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Audio, Audio Processing

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is -.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed PCM9211

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V 5 V.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is 216 KHz Digital Audio Interface Transceiver.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is PCM9211.

  • A: At what frequency does the Operating-Supply-Current?

    Q: The product Operating-Supply-Current is 13 mA.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is I2C USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$73.50
$73.50
10
$69.82
$698.25
100
$66.15
$6 615.00
500
$62.48
$31 237.50
1000
$58.80
$58 800.00
Top