| Mfr. #: | TAS5611PHD2EVM |
|---|---|
| メーカー: | Texas Instruments |
| 説明: | EVAL MODULE FOR TAS5611PHD |
| ライフサイクル: | メーカー新製品 |
| データシート: | TAS5611PHD2EVM データシート |


Product belongs to the PurePath HD series. Output-Type: 1-Channel (Mono) or 2-Channel (Stereo) Voltage Supply Range: 16 V ~ 32.5 V Maximum Output Power of 250W x 1 @ 2 Ohm; 125W x 2 @ 4 Ohm for 1 channel The amplifier is of Class D type. Included item: Board. IC package type: TAS5611PHD Board type: Fully Populated.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TAS5611PHD2EVM Specifications
A: At what frequency does the Series?
Q: The product Series is PurePath HD.
A: Is the cutoff frequency of the product Output-Type?
Q: Yes, the product's Output-Type is indeed 1-Channel (Mono) or 2-Channel (Stereo)
A: Is the cutoff frequency of the product Voltage-Supply?
Q: Yes, the product's Voltage-Supply is indeed 16 V ~ 32.5 V
A: Is the cutoff frequency of the product Max-Output-Power-x-Channels-Load?
Q: Yes, the product's Max-Output-Power-x-Channels-Load is indeed 250W x 1 @ 2 Ohm; 125W x 2 @ 4 Ohm
A: Is the cutoff frequency of the product Amplifier-Type?
Q: Yes, the product's Amplifier-Type is indeed Class D
A: What is the Supplied-Contents of the product?
Q: The Supplied-Contents of the product is Board.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is TAS5611PHD.
A: At what frequency does the Board-Type?
Q: The product Board-Type is Fully Populated.