TAS5630PHD2EVM

Mfr. #: TAS5630PHD2EVM
メーカー: Texas Instruments
説明: EVAL MODULE FOR TAS5630PHD2
ライフサイクル: メーカー新製品
データシート: TAS5630PHD2EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TAS5630PHD2EVM Overview

Product belongs to the PurePath HD series. This product is categorized as Evaluation Modules Type: Audio Amplifiers Bulk is the packaging method for this product Output-Type: 2-Channel (Stereo) Voltage Supply Range: 25 V ~ 50 V Maximum Output Power of 607W x 1 @ 2 Ohm; 318W x 2 @ 4 Ohm for 1 channel The amplifier is of Class D type. Included item: Board. IC package type: TAS5630 Board type: Fully Populated. This product operates at a 25 V to 50 V supply voltage for reliable performance. This tool is designed for the TAS5630PHD. 16 A is 92 nA. Our product measures 140 mm x 90 mm x 55 mm in dimensions for compact and convenient use.

TAS5630PHD2EVM Image

TAS5630PHD2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TAS5630PHD2EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Audio Amplifiers
  • Series PurePath HD
  • Product Evaluation Modules
  • Type Audio Amplifiers
  • Packaging Bulk
  • Output-Type 2-Channel (Stereo)
  • Voltage-Supply 25 V ~ 50 V
  • Max-Output-Power-x-Channels-Load 607W x 1 @ 2 Ohm; 318W x 2 @ 4 Ohm
  • Amplifier-Type Class D
  • Supplied-Contents Board
  • Utilized-IC-Part TAS5630
  • Board-Type Fully Populated
  • Operating-Supply-Voltage 25 V to 50 V
  • Tool-Is-For-Evaluation-Of TAS5630PHD
  • Operating-Supply-Current 16 A
  • Dimensions 140 mm x 90 mm x 55 mm

TAS5630PHD2EVM

TAS5630PHD2EVM Specifications

TAS5630PHD2EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is PurePath HD.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Audio Amplifiers.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the Output-Type?

    Q: The product Output-Type is 2-Channel (Stereo).

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is 25 V ~ 50 V.

  • A: What is the Max-Output-Power-x-Channels-Load of the product?

    Q: The Max-Output-Power-x-Channels-Load of the product is 607W x 1 @ 2 Ohm; 318W x 2 @ 4 Ohm.

  • A: What is the Amplifier-Type of the product?

    Q: The Amplifier-Type of the product is Class D.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TAS5630

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 25 V to 50 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TAS5630PHD.

  • A: At what frequency does the Operating-Supply-Current?

    Q: The product Operating-Supply-Current is 16 A.

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 140 mm x 90 mm x 55 mm.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$598.50
$598.50
10
$568.58
$5 685.75
100
$538.65
$53 865.00
500
$508.72
$254 362.50
1000
$478.80
$478 800.00
Top