THS4012EVM

Mfr. #: THS4012EVM
メーカー: Texas Instruments
説明: EVAL MOD FOR THS4012
ライフサイクル: メーカー新製品
データシート: THS4012EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
THS4012EVM Overview

Product belongs to the - series. Operational temperature range: 0°C ~ 70°C Output-Type: Single-Ended Voltage supply range: 9 V ~ 32 V, ±4.5 V ~ 16 V The 290MHz The 310 V/μs. Current-Output-Channel is 110mA The amplifier is of Voltage Feedback type. Included item: Board. IC package type: THS4012 Board type: Fully Populated. The product has 1 - Single channel per IC.

THS4012EVM Image

THS4012EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS4012EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Operating-Temperature 0°C ~ 70°C
  • Output-Type Single-Ended
  • Voltage-Supply-Single-Dual 9 V ~ 32 V, ±4.5 V ~ 16 V
  • -3db-Bandwidth 290MHz
  • Slew-Rate 310 V/μs
  • Current-Output-Channel 110mA
  • Amplifier-Type Voltage Feedback
  • Supplied-Contents Board
  • Utilized-IC-Part THS4012
  • Board-Type Fully Populated
  • Channels-per-IC 1 - Single
  • Current-Supply-Main-IC 7.8mA

THS4012EVM

THS4012EVM Specifications

THS4012EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Operating-Temperature?

    Q: Yes, the product's Operating-Temperature is indeed 0°C ~ 70°C

  • A: At what frequency does the Output-Type?

    Q: The product Output-Type is Single-Ended.

  • A: What is the Voltage-Supply-Single-Dual of the product?

    Q: The Voltage-Supply-Single-Dual of the product is 9 V ~ 32 V, ±4.5 V ~ 16 V.

  • A: Is the cutoff frequency of the product -3db-Bandwidth?

    Q: Yes, the product's -3db-Bandwidth is indeed 290MHz

  • A: At what frequency does the Slew-Rate?

    Q: The product Slew-Rate is 310 V/μs.

  • A: At what frequency does the Current-Output-Channel?

    Q: The product Current-Output-Channel is 110mA.

  • A: At what frequency does the Amplifier-Type?

    Q: The product Amplifier-Type is Voltage Feedback.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is THS4012.

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

  • A: At what frequency does the Channels-per-IC?

    Q: The product Channels-per-IC is 1 - Single.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$0.00
$0.00
10
$0.00
$0.00
100
$0.00
$0.00
500
$0.00
$0.00
1000
$0.00
$0.00
Top