| Mfr. #: | TMP100EVM |
|---|---|
| メーカー: | Texas Instruments |
| 説明: | EVALUATION MODULE FOR TMP100 |
| ライフサイクル: | メーカー新製品 |
| データシート: | TMP100EVM データシート |


Product belongs to the - series. Sensitivity: ±0.5°C Interface: I2C, SMBus Voltage Supply Range: 2.7 V ~ 5.5 V Temperature Sensing range of -55°C ~ 125°C Included item: Board. IC package type: TMP100

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP100EVM Specifications
A: Is the cutoff frequency of the product Series?
Q: Yes, the product's Series is indeed -
A: Is the cutoff frequency of the product Sensitivity?
Q: Yes, the product's Sensitivity is indeed ±0.5°C
A: At what frequency does the Interface?
Q: The product Interface is I2C, SMBus.
A: At what frequency does the Voltage-Supply?
Q: The product Voltage-Supply is 2.7 V ~ 5.5 V.
A: What is the Sensor-Type of the product?
Q: The Sensor-Type of the product is Temperature.
A: At what frequency does the Sensing-Range?
Q: The product Sensing-Range is -55°C ~ 125°C.
A: What is the Supplied-Contents of the product?
Q: The Supplied-Contents of the product is Board.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is TMP100.