TMP112EVM

Mfr. #: TMP112EVM
メーカー: Texas Instruments
説明: Sensor Development Tools Temperature Sensor Development Tools TMP112EVM
ライフサイクル: メーカー新製品
データシート: TMP112EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP112EVM Overview

Product belongs to the TMP112 series. This product is categorized as Evaluation Boards Type: Temperature Sensors This product is designed SM-USB-DIG amplifier. Sensitivity: ±1°C Interface: I2C Voltage Supply Range: - Temperature Sensing range of -40°C ~ 125°C Included item: 2 Boards, Cables. IC package type: TMP112 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the TMP112.

TMP112EVM Image

TMP112EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP112EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series TMP112
  • Product Evaluation Boards
  • Type Temperature Sensors
  • For-Use-With SM-USB-DIG
  • Sensitivity ±1°C
  • Interface I2C
  • Voltage-Supply -
  • Sensor-Type Temperature
  • Sensing-Range -40°C ~ 125°C
  • Supplied-Contents 2 Boards, Cables
  • Embedded No
  • Utilized-IC-Part TMP112
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TMP112

TMP112EVM

TMP112EVM Specifications

TMP112EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed TMP112

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is Temperature Sensors.

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed SM-USB-DIG

  • A: What is the Sensitivity of the product?

    Q: The Sensitivity of the product is ±1°C.

  • A: Is the cutoff frequency of the product Interface?

    Q: Yes, the product's Interface is indeed I2C

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is -.

  • A: At what frequency does the Sensor-Type?

    Q: The product Sensor-Type is Temperature.

  • A: At what frequency does the Sensing-Range?

    Q: The product Sensing-Range is -40°C ~ 125°C.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is 2 Boards, Cables.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TMP112.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TMP112

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$148.50
$148.50
10
$141.08
$1 410.75
100
$133.65
$13 365.00
500
$126.22
$63 112.50
1000
$118.80
$118 800.00
Top