TMP451EVM

Mfr. #: TMP451EVM
メーカー: Texas Instruments
説明: Sensor Development Tools Temperature Sensor Development Tools TMP451 EVAL MOD
ライフサイクル: メーカー新製品
データシート: TMP451EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP451EVM Overview

Product belongs to the TMP451 series. This product is categorized as Evaluation Modules Type: Temperature Sensors Sensitivity: ±1°C Interface: I2C Voltage Supply Range: - Temperature Sensing range of - Included item: 2 Boards, Cables. IC package type: TMP451 This product operates at a 1.8 V 3.3 V supply voltage for reliable performance. This tool is designed for the TMP451. I2C SPI interface type

TMP451EVM Image

TMP451EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP451EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series TMP451
  • Product Evaluation Modules
  • Type Temperature Sensors
  • Sensitivity ±1°C
  • Interface I2C
  • Voltage-Supply -
  • Sensor-Type Temperature
  • Sensing-Range -
  • Supplied-Contents 2 Boards, Cables
  • Embedded -
  • Utilized-IC-Part TMP451
  • Operating-Supply-Voltage 1.8 V 3.3 V
  • Tool-Is-For-Evaluation-Of TMP451
  • Interface-Type I2C SPI

TMP451EVM

TMP451EVM Specifications

TMP451EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is TMP451.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Temperature Sensors.

  • A: At what frequency does the Sensitivity?

    Q: The product Sensitivity is ±1°C.

  • A: At what frequency does the Interface?

    Q: The product Interface is I2C.

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is -.

  • A: What is the Sensor-Type of the product?

    Q: The Sensor-Type of the product is Temperature.

  • A: What is the Sensing-Range of the product?

    Q: The Sensing-Range of the product is -.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed 2 Boards, Cables

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TMP451.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 1.8 V 3.3 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TMP451.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed I2C SPI

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$86.85
$86.85
10
$82.51
$825.08
100
$78.16
$7 816.50
500
$73.82
$36 911.25
1000
$69.48
$69 480.00
Top