TPA2001D2EVM

Mfr. #: TPA2001D2EVM
メーカー: Texas Instruments
説明: EVAL MOD FOR TPA2001D2
ライフサイクル: メーカー新製品
データシート: TPA2001D2EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA2001D2EVM Overview

Product belongs to the - series. Type: Audio Amplifiers Output-Type: 2-Channel (Stereo) Voltage Supply Range: 4.5 V ~ 5.5 V Maximum Output Power of 1W x 2 @ 8 Ohm for 1 channel The amplifier is of Class D type. Included item: Board. IC package type: TPA2001D2 Board type: Fully Populated. This product operates at a 5 V to 15 V supply voltage for reliable performance. This tool is designed for the TPA2001D2.

TPA2001D2EVM Image

TPA2001D2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA2001D2EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Audio Amplifiers
  • Series -
  • Type Audio Amplifiers
  • Output-Type 2-Channel (Stereo)
  • Voltage-Supply 4.5 V ~ 5.5 V
  • Max-Output-Power-x-Channels-Load 1W x 2 @ 8 Ohm
  • Amplifier-Type Class D
  • Supplied-Contents Board
  • Output-Power 1 W
  • Utilized-IC-Part TPA2001D2
  • Board-Type Fully Populated
  • Operating-Supply-Voltage 5 V to 15 V
  • Tool-Is-For-Evaluation-Of TPA2001D2

TPA2001D2EVM

TPA2001D2EVM Specifications

TPA2001D2EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Type of the product?

    Q: The Type of the product is Audio Amplifiers.

  • A: Is the cutoff frequency of the product Output-Type?

    Q: Yes, the product's Output-Type is indeed 2-Channel (Stereo)

  • A: Is the cutoff frequency of the product Voltage-Supply?

    Q: Yes, the product's Voltage-Supply is indeed 4.5 V ~ 5.5 V

  • A: At what frequency does the Max-Output-Power-x-Channels-Load?

    Q: The product Max-Output-Power-x-Channels-Load is 1W x 2 @ 8 Ohm.

  • A: What is the Amplifier-Type of the product?

    Q: The Amplifier-Type of the product is Class D.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TPA2001D2.

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 5 V to 15 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TPA2001D2.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$56.74
$56.74
10
$53.91
$539.08
100
$51.07
$5 107.05
500
$48.23
$24 116.65
1000
$45.40
$45 396.00
Top