TPS2115EVM

Mfr. #: TPS2115EVM
メーカー: Texas Instruments
説明: EVAL MOD FOR TPS2115
ライフサイクル: メーカー新製品
データシート: TPS2115EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2115EVM Overview

Product belongs to the - series. The Power Management, Power Distribution Switch (Load Switch) is the Main-Purpose. Primary-Attributes: - IC package type: TPS2115

TPS2115EVM Image

TPS2115EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2115EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Main-Purpose Power Management, Power Distribution Switch (Load Switch)
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part TPS2115

TPS2115EVM

TPS2115EVM Specifications

TPS2115EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Power Distribution Switch (Load Switch)

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is -.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TPS2115.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$56.74
$56.74
10
$53.91
$539.08
100
$51.07
$5 107.05
500
$48.23
$24 116.65
1000
$45.40
$45 396.00
Top