Product belongs to the - series. This product is categorized as Evaluation Boards Type: Hot Swap Voltage Controllers The Power Management, Hot Swap Controller is the Main-Purpose. Primary-Attributes: - IC package type: TPS2390 Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C This tool is designed for the TPS2390. Our product measures 81.9 mm x 56.8 mm in dimensions for compact and convenient use. Input Voltage Range: - 48 V

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2390EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: At what frequency does the Product?
Q: The product Product is Evaluation Boards.
A: What is the Type of the product?
Q: The Type of the product is Hot Swap Voltage Controllers.
A: What is the Main-Purpose of the product?
Q: The Main-Purpose of the product is Power Management, Hot Swap Controller.
A: What is the Primary-Attributes of the product?
Q: The Primary-Attributes of the product is -.
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is TPS2390.
A: What is the Maximum-Operating-Temperature of the product?
Q: The Maximum-Operating-Temperature of the product is + 85 C.
A: At what frequency does the Minimum-Operating-Temperature?
Q: The product Minimum-Operating-Temperature is - 40 C.
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is TPS2390.
A: What is the Dimensions of the product?
Q: The Dimensions of the product is 81.9 mm x 56.8 mm.
A: At what frequency does the Input-Voltage?
Q: The product Input-Voltage is - 48 V.