TPS54873EVM Overview

Product belongs to the SWIFT series. This product is categorized as Evaluation Boards Type: Voltage Regulators - Switching Regulators Bulk is the packaging method for this product The DC/DC, Step Down is the Main-Purpose. 4 V ~ 6 V voltage input This product features 'Frequency-Switching' at 700kHz for optimal performance. Output voltage: 3.3V Buck regulator topology - Included item: Board. IC package type: TPS54873 Board type: Fully Populated. The product has 1, Non-Isolated outputs. Output voltage: 3.3 V This tool is designed for the TPS54873. Our product measures 76.2 mm x 76.2 mm in dimensions for compact and convenient use. Input Voltage Range: 5 V

TPS54873EVM Image

TPS54873EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS54873EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series SWIFT
  • Product Evaluation Boards
  • Type Voltage Regulators - Switching Regulators
  • Packaging Bulk
  • Main-Purpose DC/DC, Step Down
  • Voltage-Input 4 V ~ 6 V
  • Frequency-Switching 700kHz
  • Current-Output 8A
  • Voltage-Output 3.3V
  • Regulator-Topology Buck
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part TPS54873
  • Board-Type Fully Populated
  • Outputs-and-Type 1, Non-Isolated
  • Output-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TPS54873
  • Dimensions 76.2 mm x 76.2 mm
  • Input-Voltage 5 V

TPS54873EVM

TPS54873EVM Specifications

TPS54873EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is SWIFT.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Voltage Regulators - Switching Regulators.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is DC/DC, Step Down.

  • A: At what frequency does the Voltage-Input?

    Q: The product Voltage-Input is 4 V ~ 6 V.

  • A: At what frequency does the Frequency-Switching?

    Q: The product Frequency-Switching is 700kHz.

  • A: What is the Voltage-Output of the product?

    Q: The Voltage-Output of the product is 3.3V.

  • A: At what frequency does the Regulator-Topology?

    Q: The product Regulator-Topology is Buck.

  • A: At what frequency does the Power-Output?

    Q: The product Power-Output is -.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TPS54873

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: Is the cutoff frequency of the product Outputs-and-Type?

    Q: Yes, the product's Outputs-and-Type is indeed 1, Non-Isolated

  • A: At what frequency does the Output-Voltage?

    Q: The product Output-Voltage is 3.3 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TPS54873

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 76.2 mm x 76.2 mm.

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 5 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$11.58
$11.58
10
$11.00
$110.01
100
$10.42
$1 042.20
500
$9.84
$4 921.50
1000
$9.26
$9 264.00
Top