| Mfr. #: | TPS7B6950EVM |
|---|---|
| メーカー: | Texas Instruments |
| 説明: | EVALUATION MODULE TPS7B6950 |
| ライフサイクル: | メーカー新製品 |
| データシート: | TPS7B6950EVM データシート |


Product belongs to the - series. This product is categorized as Evaluation Modules Type: Linear Voltage Regulators Bulk is the packaging method for this product Operational temperature range: -40°C ~ 125°C 5.5 V ~ 40 V voltage input Output voltage: 5V Included item: Board. IC package type: TPS7B6950-Q1 Board type: Fully Populated. The product has 1 - Single channel per IC. This product features a Positive Fixed. Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C This product is an TPS7B6950QDCYRQ1 low quiescent low dropout evaluation module. This tool is designed for the TPS7B6950. Input Voltage Range: 5.5 V to 40 V Output current: 150 mA

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS7B6950EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is Linear Voltage Regulators.
A: Is the cutoff frequency of the product Packaging?
Q: Yes, the product's Packaging is indeed Bulk
A: At what frequency does the Operating-Temperature?
Q: The product Operating-Temperature is -40°C ~ 125°C.
A: Is the cutoff frequency of the product Voltage-Input?
Q: Yes, the product's Voltage-Input is indeed 5.5 V ~ 40 V
A: Is the cutoff frequency of the product Voltage-Output?
Q: Yes, the product's Voltage-Output is indeed 5V
A: Is the cutoff frequency of the product Supplied-Contents?
Q: Yes, the product's Supplied-Contents is indeed Board
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed TPS7B6950-Q1
A: What is the Board-Type of the product?
Q: The Board-Type of the product is Fully Populated.
A: At what frequency does the Channels-per-IC?
Q: The product Channels-per-IC is 1 - Single.
A: Is the cutoff frequency of the product Regulator-Type?
Q: Yes, the product's Regulator-Type is indeed Positive Fixed
A: What is the Maximum-Operating-Temperature of the product?
Q: The Maximum-Operating-Temperature of the product is + 125 C.
A: At what frequency does the Minimum-Operating-Temperature?
Q: The product Minimum-Operating-Temperature is - 40 C.
A: What is the Description-Function of the product?
Q: The Description-Function of the product is TPS7B6950QDCYRQ1 low quiescent low dropout evaluation module.
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TPS7B6950
A: Is the cutoff frequency of the product Input-Voltage?
Q: Yes, the product's Input-Voltage is indeed 5.5 V to 40 V
A: Is the cutoff frequency of the product Output-Current?
Q: Yes, the product's Output-Current is indeed 150 mA