TRF3705EVM

Mfr. #: TRF3705EVM
メーカー: Texas Instruments
説明: EVAL MODULE FOR TRF3705
ライフサイクル: メーカー新製品
データシート: TRF3705EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF3705EVM Overview

Compatible with TRF3705. Product belongs to the - series. This product is categorized as Evaluation Modules Type: Modulator This product's 300MHz ~ 4GHz range is 0Hz to 2.2GHz. Included item: Board. This product operates at a 0 V to 3.6 V supply voltage for reliable performance. This tool is designed for the TRF3705.

TRF3705EVM Image

TRF3705EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF3705EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products TRF3705
  • Series -
  • Product Evaluation Modules
  • Type Modulator
  • Frequency 300MHz ~ 4GHz
  • Supplied-Contents Board
  • Operating-Supply-Voltage 0 V to 3.6 V
  • Tool-Is-For-Evaluation-Of TRF3705

TRF3705EVM

TRF3705EVM Specifications

TRF3705EVM FAQ
  • A: Is the cutoff frequency of the product For-Use-With-Related-Products?

    Q: Yes, the product's For-Use-With-Related-Products is indeed TRF3705

  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Modulator.

  • A: Is the cutoff frequency of the product Frequency?

    Q: Yes, the product's Frequency is indeed 300MHz ~ 4GHz

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 0 V to 3.6 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TRF3705

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$230.43
$230.43
10
$218.91
$2 189.08
100
$207.39
$20 738.70
500
$195.87
$97 932.75
1000
$184.34
$184 344.00
Top