TRF37A32EVM

Mfr. #: TRF37A32EVM
メーカー: Texas Instruments
説明: EVAL BOARD FOR TRF37A32
ライフサイクル: メーカー新製品
データシート: TRF37A32EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF37A32EVM Overview

Compatible with TRF37A32. Product belongs to the - series. This product is categorized as Evaluation Boards Type: Mixer This product is designed TRF37x32 amplifier. This product's 400MHz ~ 1.7GHz range is 0Hz to 2.2GHz. Included item: Board. This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the TRF37x32. USB interface type

TRF37A32EVM Image

TRF37A32EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF37A32EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products TRF37A32
  • Series -
  • Product Evaluation Boards
  • Type Mixer
  • For-Use-With TRF37x32
  • Frequency 400MHz ~ 1.7GHz
  • Supplied-Contents Board
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TRF37x32
  • Interface-Type USB

TRF37A32EVM

TRF37A32EVM Specifications

TRF37A32EVM FAQ
  • A: At what frequency does the For-Use-With-Related-Products?

    Q: The product For-Use-With-Related-Products is TRF37A32.

  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is Mixer.

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is TRF37x32.

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 400MHz ~ 1.7GHz.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TRF37x32.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$298.50
$298.50
10
$283.58
$2 835.75
100
$268.65
$26 865.00
500
$253.72
$126 862.50
1000
$238.80
$238 800.00
Top