TRF37A73EVM

Mfr. #: TRF37A73EVM
メーカー: Texas Instruments
説明: EVAL MODULE FOR TRF37A73
ライフサイクル: メーカー新製品
データシート: TRF37A73EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF37A73EVM Overview

Compatible with TRF37A73. Product belongs to the - series. This product is categorized as Evaluation Modules Type: Amplifier Bulk is the packaging method for this product This product's 1MHz ~ 6GHz range is 0Hz to 2.2GHz. Included item: Board. This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the TRF37A73.

TRF37A73EVM Image

TRF37A73EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF37A73EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products TRF37A73
  • Series -
  • Product Evaluation Modules
  • Type Amplifier
  • Packaging Bulk
  • Frequency 1MHz ~ 6GHz
  • Supplied-Contents Board
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TRF37A73

TRF37A73EVM

TRF37A73EVM Specifications

TRF37A73EVM FAQ
  • A: Is the cutoff frequency of the product For-Use-With-Related-Products?

    Q: Yes, the product's For-Use-With-Related-Products is indeed TRF37A73

  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Amplifier

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 1MHz ~ 6GHz.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TRF37A73.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$56.74
$56.74
10
$53.91
$539.08
100
$51.07
$5 107.05
500
$48.23
$24 116.65
1000
$45.40
$45 396.00
Top