TRF37D73EVM

Mfr. #: TRF37D73EVM
メーカー: Texas Instruments
説明: EVAL MODULE FOR TRF37A73
ライフサイクル: メーカー新製品
データシート: TRF37D73EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF37D73EVM Overview

Compatible with TRF37D73. Product belongs to the - series. This product is categorized as Evaluation Modules Type: Amplifier Bulk is the packaging method for this product This product's 1MHz ~ 6GHz range is 0Hz to 2.2GHz. Included item: Board. This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the TRF37D73.

TRF37D73EVM Image

TRF37D73EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF37D73EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products TRF37D73
  • Series -
  • Product Evaluation Modules
  • Type Amplifier
  • Packaging Bulk
  • Frequency 1MHz ~ 6GHz
  • Supplied-Contents Board
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TRF37D73

TRF37D73EVM

TRF37D73EVM Specifications

TRF37D73EVM FAQ
  • A: Is the cutoff frequency of the product For-Use-With-Related-Products?

    Q: Yes, the product's For-Use-With-Related-Products is indeed TRF37D73

  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Amplifier.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Frequency?

    Q: Yes, the product's Frequency is indeed 1MHz ~ 6GHz

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TRF37D73

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$73.50
$73.50
10
$69.82
$698.25
100
$66.15
$6 615.00
500
$62.48
$31 237.50
1000
$58.80
$58 800.00
Top