TSC2006EVM

Mfr. #: TSC2006EVM
メーカー: Texas Instruments
説明: Sensor Development Tools Touch Sensor Development Tools TSC2006 Eval Mod
ライフサイクル: メーカー新製品
データシート: TSC2006EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSC2006EVM Overview

Product belongs to the - series. The Interface, Touch Screen Controller is the Main-Purpose. Primary-Attributes: 4-Wire Resistive Touch Screen Controller, I2C and SPI Interfaces IC package type: TSC2006

TSC2006EVM Image

TSC2006EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2006EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Main-Purpose Interface, Touch Screen Controller
  • Primary-Attributes 4-Wire Resistive Touch Screen Controller, I2C and SPI Interfaces
  • Embedded No
  • Utilized-IC-Part TSC2006

TSC2006EVM

TSC2006EVM Specifications

TSC2006EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Interface, Touch Screen Controller.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed 4-Wire Resistive Touch Screen Controller, I2C and SPI Interfaces

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TSC2006.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$31.40
$31.40
10
$29.83
$298.25
100
$28.26
$2 825.55
500
$26.69
$13 342.90
1000
$25.12
$25 116.00
Top