TSC2008EVM

Mfr. #: TSC2008EVM
メーカー: Texas Instruments
説明: Sensor Development Tools Touch Sensor Development Tools TSC2008EVM Eval Mod
ライフサイクル: メーカー新製品
データシート: TSC2008EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSC2008EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Resistive Touch Sensors The Interface, Touch Screen Controller is the Main-Purpose. Primary-Attributes: 4-Wire Resistive Touch Screen Controller, I2C and SPI Interfaces IC package type: TSC2008 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the TSC2008. 4-Wire interface type

TSC2008EVM Image

TSC2008EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2008EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Resistive Touch Sensors
  • Main-Purpose Interface, Touch Screen Controller
  • Primary-Attributes 4-Wire Resistive Touch Screen Controller, I2C and SPI Interfaces
  • Embedded No
  • Utilized-IC-Part TSC2008
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TSC2008
  • Interface-Type 4-Wire

TSC2008EVM

TSC2008EVM Specifications

TSC2008EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Resistive Touch Sensors.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Interface, Touch Screen Controller

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is 4-Wire Resistive Touch Screen Controller, I2C and SPI Interfaces.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TSC2008

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TSC2008.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is 4-Wire.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$55.06
$55.06
10
$52.31
$523.12
100
$49.56
$4 955.85
500
$46.81
$23 402.65
1000
$44.05
$44 052.00
Top