TSW4100EVM

Mfr. #: TSW4100EVM
メーカー: Texas Instruments
説明: KIT WIDEBAND DGTL REPEATER DEMO
ライフサイクル: メーカー新製品
データシート: TSW4100EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSW4100EVM Overview

Product belongs to the - series. The Interface, Buffer/Repeater is the Main-Purpose. Primary-Attributes: - IC package type: ADS5545, CDC7005, DAC5688, GC5016

TSW4100EVM Image

TSW4100EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSW4100EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Main-Purpose Interface, Buffer/Repeater
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part ADS5545, CDC7005, DAC5688, GC5016

TSW4100EVM

TSW4100EVM Specifications

TSW4100EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Interface, Buffer/Repeater.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS5545, CDC7005, DAC5688, GC5016.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$2.00
$2.00
10
$2.00
$20.00
100
$2.00
$200.00
500
$1.00
$500.00
1000
$1.00
$1 000.00
Top